[1]
“Power Line Communication Feasibility Study for Advanced Metering Infrastructure Project of an Electric Utility in Pakistan”, UCP J. Sci. Technol., vol. 3, no. 1, pp. 18–28, Dec. 2025, doi: 10.24312/ucp-jst.03.01.718.